Infrastructure of Al-Fadhli site


Infrastructure of Al-Fadhli site

Scope of work:

  • - Site preparation of ​​approximately (14,000,000) m2, including excavation and backfilling in an amount of 40 million m3, and making mud side slopes.
  • - The construction of approximately 40 km of asphalt road with sulfur extended asphalt, patrol roads along 40 km, and 20 km for heavy transport roads.
  • - The construction of (40) km of solar energy poles.
  • - The construction of a fence approximately (30) km.
  • - The construction of an overhead electric line, (22) km long, medium pressure of 34.5 kv, including networking towers.
  • - The construction of a substation, medium pressure of 34.5 kv.

Work Area

  • Enterprise Saudi Aramco
  • City Al-Fadhli - Eastern Province
  • Start At 2009-02-10
  • Duration Year
  • Project Status مكتمل