Scope of work:
The construction of (2) towers connected together through a central point, and the total construction area of the project is (77,630) square meters to accommodate (3,500) offices including necessary facilities.
Infrastructure and superstructure works, mechanical works, electrical, plumbing, facades, outdoor works, finishing works.
The construction of a basement and (13) floors, with a total area (5,300) square meters for each floor.
The total built area is 65,000 square meters.
Installation of (18) Elevators.
The construction of shaded park for (4,300) vehicles.
Asphalt roads, (350,000) square meters.
Extension of (20) kilometers of underground pipes including drainage channels.
Pumping station.
4500 ton air conditioning units using new technology for the first time in the Kingdom.
(7) Substations.
-
Project status :Complete
-
Project Duration :Two years
-
Project site :Dhahran city
-
Client name :SAUDI ARAMCO
-
project name :Construction of North Park Office Complex for Saudi Aramco
Related Articles
- Dammam South Housing - site preparation and infrastructure project
- Project for the construction of the laboratory building at the College of Petroleum Engineering and Geosciences at King Fahd University of Petroleum and Minerals
- Public site development project for the Innovation Center
- Crash Rated Fence at Vital Facilities project
- Project for the construction of supporting industrial facilities - Jazan Refinery
- South Dhahran Home Ownership (SDHO) Inc. II Construction Access Road (AJYAL 2)
- Home Ownership Site Preparation, South Dhahran (AJYAL 1)
- Expand Dhahran Residential Community –Utility infrastructure and Networks Package 2
- Expand Dhahran Residential Community Package 1 (Facilities, infrastructure and networks)
- An excavation project for the historic shield gate - West Side
- Construction and Detailed Engineering Design Contract for the Laboratories Building of the College of Petroleum Engineering & Geosciences in KFUPM
- The construction of Saudi Arabian Agricultural Bank
- Implementation of development and development work in the centre of Al-Awamiya in Qatif province
- The construction of Al-Khobar Residential Complex - Third Stage - Part A
- The construction of three train stations in (Dammam, Hofuf, Riyadh)