Construction
Implementation of development and development work in the centre of Al-Awamiya in Qatif province
Implementation of development and development work in the centre of Al-Awamiya in Qatif province
Scope of work:
The town was developed with a vision for the future where the project was implemented in a model way as a civilized, cultural and social center to attract tourists and investments. The project included a number of landmarks that provide multiple cultural and tourism services to serve the residents and visitors of the region.
From the heritage and historical architecture of Qatif, the project was inspired by the designs of the buildings, to embrace the legacy of the past, the beauty of the present, and the vision of the future.
Several elements were used in the exterior design, such as historical towers, existing water eyes which were connected to each other by channels mimicking the canals used in the past to irrigate farms, and a cultural center was established that will be a scientific area, along with the popular market and 94 thousand square meters of gardens And the parks. In addition to recreation sessions and activities, children's playgrounds, and outdoor walkways.
-
- Land Area: 200,000 m2
- Landscape Area: ≈ 70%
- Developed Area: ≈ 30%
- Main Structures: Cultural Centre (max. 2 story with ≈ 4,500m2 footprint)
- Other Structures: 5 ‘heritage’ towers (max. 2 story high)
- Popular market buildings
- Main courtyard buildings
- Heritage house
- Roads with Lighting: ≈ 2,300m
- Infrastructure Works:
- Storm Water Drainage Network: GRP Pipes with diameters of 400 -800 mm and length of 9600 M with Manholes & Catch basins.
- Sewer Distribution Network: GRP Pipes with diameters of 200-400 mm and length of 2390 M.
- Water Distribution Network: HDPE Pipes with diameters of 110-400 mm and length of 3420 M.
- Irrigation Network: HDPE Pipes with diameters of 100-250 mm and length of 7160 M.
- MV and LV Power, Telecoms
-
Other Works: Extensive Landscape Works
-
Project status :Complete
-
Project Duration :Two years
-
Project site :Al-Awamiya - Qatif
-
Client name :EASTERN PROVINCE MUNICIPALITY
-
project name :Development of Central Awamiyah in Qatif
Related Articles
- Dammam South Housing - site preparation and infrastructure project
- Project for the construction of the laboratory building at the College of Petroleum Engineering and Geosciences at King Fahd University of Petroleum and Minerals
- Public site development project for the Innovation Center
- Crash Rated Fence at Vital Facilities project
- Project for the construction of supporting industrial facilities - Jazan Refinery
- South Dhahran Home Ownership (SDHO) Inc. II Construction Access Road (AJYAL 2)
- Home Ownership Site Preparation, South Dhahran (AJYAL 1)
- Expand Dhahran Residential Community –Utility infrastructure and Networks Package 2
- Expand Dhahran Residential Community Package 1 (Facilities, infrastructure and networks)
- An excavation project for the historic shield gate - West Side
- Construction and Detailed Engineering Design Contract for the Laboratories Building of the College of Petroleum Engineering & Geosciences in KFUPM
- The construction of Saudi Arabian Agricultural Bank
- The construction of Al-Khobar Residential Complex - Third Stage - Part A
- The construction of three train stations in (Dammam, Hofuf, Riyadh)
- The construction of Internal Security Forces Hospital - MINISTRY OF INTERIOR