Construction
KFUPM Student Housing Project (Phases 1, 3, 4, 5)
KFUPM Student Housing Project (Phases 1, 3, 4, 5)
Scope of work:
First: (Phases 1, 3, 4)
- The construction of (30) residential buildings for students of precast concrete, including a ground floor and two floors. Each building includes (84) bedrooms, with a construction area of (3720) m2, for each building.
- The construction of (6) sitting rooms for students with an area of (691) m2.
- The construction of (3) mosques with an area of (742) m2.
- Development works for the general site of student housing for all phases.
- External and internal works (walkway, sidewalks, sewage openings, paving roads, car park shades, fence, steel fence, services, pay TV, playground, water supply, fire alarm and firefighting system, rain drainage network, sewage network, medium and low voltage distribution networks, telephone network).
Second: The Fifth Phase
- The construction of (9) residential buildings for students of precast concrete, including a ground floor and two floors. Each building includes (84) bedrooms, with a construction area of (5000) m2 for each building.
- The construction of (3) sitting rooms for students.
- The construction of chiller buildings of ready mix concrete.
- The construction of (3) parking buildings, each building consists of (5) floors with an area of (4000) m2 for each building.
- The capacity of each building is (1000) cars, using electronic access control devices.
-
Project status :Two years
-
Project Duration :Complete
-
Project site :Dhahran City - Eastern
-
Client name :KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS
-
project name :KFUPM Student Housing Project (Phases 1, 3, 4, 5)
Related Articles
- Dammam South Housing - site preparation and infrastructure project
- Project for the construction of the laboratory building at the College of Petroleum Engineering and Geosciences at King Fahd University of Petroleum and Minerals
- Public site development project for the Innovation Center
- Crash Rated Fence at Vital Facilities project
- Project for the construction of supporting industrial facilities - Jazan Refinery
- South Dhahran Home Ownership (SDHO) Inc. II Construction Access Road (AJYAL 2)
- Home Ownership Site Preparation, South Dhahran (AJYAL 1)
- Expand Dhahran Residential Community –Utility infrastructure and Networks Package 2
- Expand Dhahran Residential Community Package 1 (Facilities, infrastructure and networks)
- An excavation project for the historic shield gate - West Side
- Construction and Detailed Engineering Design Contract for the Laboratories Building of the College of Petroleum Engineering & Geosciences in KFUPM
- The construction of Saudi Arabian Agricultural Bank
- Implementation of development and development work in the centre of Al-Awamiya in Qatif province
- The construction of Al-Khobar Residential Complex - Third Stage - Part A
- The construction of three train stations in (Dammam, Hofuf, Riyadh)